It is too slow or too costly: what now?

  • You will learn: what a change costs, and nine levers that lower it, each with its risk.
  • Reading time: 5 minutes.
  • Before this: Change your team settings.

GTM spends agent time to save your attention. Every role runs the strongest model by default, so a Feature uses more of your plan than asking Claude Code directly. A Fix is the cheap path.

What does a change cost?

Measured on GTM’s own changes:

Change Size Agent time Measured on
2 files, on security ground Fix 71 s GTM 0.3.0
a docs fix and one workflow argument, 2 tasks Feature 11 min, 61% of it the final review GTM 0.3.0
a workflow change, 3 tasks Feature 58 min GTM 0.2.0

Installed and idle, GTM adds about 760 tokens to a session, measured by size.mjs on GTM 0.13.0. No controlled comparison with Claude Code alone has been run yet.

How do I know what a change will cost before it runs?

The spec and the plan each end with an estimate: the number of tasks times the median of the last five measured runs, phase by phase, in minutes and tokens. With no measured run yet, they say so. When the plan’s estimate passes 1.5 times the spec’s, you get a Heads-up and a card: go on, or revise the plan.

Each delivered branch adds a run line to the logbook. It ends with what Claude Code measured, measured <minutes>m <tokens>k <agents>a, phase by phase, and then how much of your limits it used, one figure per window your plan reports, such as limits 5h +12% 7d +3%; a window your plan does not report is left out. The next estimates read these lines.

What happens when my plan’s limits run low?

With the usage step from /gtm:init, GTM reads your 5-hour and 7-day limits before each phase, or the one of them your plan reports. When a phase would take you past one, it waits and shows a card:

Option What it does
A, lighter for this branch moves at most two roles, among the implementer, reviewer, architect and designer, to sonnet at low effort, for this branch only
B, keep runs as set
C, pause runs /gtm:pause until the limit resets

Option A never promises a saving and never touches the security, data or final reviewers, and nothing skips a review. Your team.md stays unchanged; the choice is written to the logbook. To undo it, start the next branch: it runs with your team settings again. When A wins in two branches, /gtm:tune proposes to make it lasting. What the step stores, and how to remove it, is in Use GTM with other plugins.

Which levers make it cheaper?

Each lever saves something and risks something. Most change your team settings; every field is in Settings.

Lever What it saves What it risks
Keep the change small enough to stay a Fix the spec, the plan and the final review: 71 s against 11 min or more nothing, while it stays within its file limit; past it, it grows into a Feature
Lower a role’s effort with /gtm:tune tokens on every call of that role; the roles that run most often save most that role misses more; reviews and correction rounds catch part of it
Narrow a specialist’s paths a security, data or screen review on tasks outside its ground a path rule that is too narrow misses a change; the final review catches it
Keep design.screens off when nothing is visual the mockups step: a designer and a critic for each screen a screen change goes unscored before it is built
Mark independent tasks [P] in the plan wall time: tasks whose files do not overlap run at once nothing on the result; a conflict stops the merges until you decide
Keep plans to 8 tasks or fewer, each a vertical slice (tasks per branch) the fixed cost each task pays: brief, review, report a slice too big for one review; the reviewer splits its findings
Keep task briefs short: the task, the constraints it touches, paths to the rest the tokens each implementer reads a rule the brief points at but the implementer skips; the review catches it
Set design.kit so screens built only from the kit are designed in code a designer and a critic per screen: 20 to 25 minutes each a screen you approve from captures rather than mockups
Read summaries with /gtm:brief-me your reading time: it shows any document at brief, standard or deep detail a detail you would have caught in the full text

Where does the time go in a Feature?

In the 11 minute Feature above, the final review took 61% of it. In the 58 minute one, the security task, with its two rounds of correction, and the architect’s dry run of the plan took most of it. A Feature of one task that passes its review with no correction round skips the final review: that review, with every specialist it called in, was the last.